Development of Deep Conversion Complex Master plan for JSC TANECO;
Development of Stadiya Proekt documentation (Design Documentation) with increased crude hydrocarbons output to 14 mln. tons per year;
Updating Master plan for TANECO Deep Conversion Complex based on change in RF oil industry taxation system (implementation of “great tax maneuver'”);
Incoming control and revision of detailed documentation;
Verification of completeness and accuracy of as-built technical documentation;
Support in implementation of facilities construction Project;
Second stage units basic design documentation development and acceptance (Naphta Hydrotreating Unit, FCC Unit, Isomerization Unit, Middle Distallates Hydrotreatment Unit, Hydrogen Unit);
Preparation of bid packages and analysis of technical and commercial bids for Detailed design of facilities for Complex further development;
Technical follow-up of orders for equipment manufacturing;
Providing services of engineering and technical support on commissioning works for Customer’s Offsite facilities construction project;
Engineering services for analysis of Combined Sulfur Unit design documentation;
Engineering supervision of construction and installation works at Combined Sulfur Unit;
Commissioning works and integrated testing of the equipment of Combined Sulfur Unit;
Organization and control of pilot tests with Customer’s feedstock using hydroconversion technology;
Organization and control of preparation of basic design data for development of basic design documentation related to hydroconversion technology;
Design and detailed documentation development and transfer to ownership, 3D model and its catalogue for Refinery and Petrochemical Plants Complex, Nizhnekamsk;
Following all the required expert reviews and approvals in state expertise authorities to obtain the approval of design documentation in FAU RF Glavgosexpertiza;
Preparation of materials package and expert support in the context of works to award the status to the National Project “Development of domestic heavy oil stock Hydroconversion technology to produce high-quality fuels, oils and feed for petrochemical processes”;
Services of auditing Basic engineering of Light Naphtha Isomerization Unit;
Organization and control of development of detailed documentation for Cocker Heavy Gasoil Hydrotreating Unit ;
Support in implementing construction Project of Refinery and Petrochemical Plants Complex facilities;
Technical support of equipment manufacturing orders for Heavy Coker Gasoil Hydrotreating Unit at Refinery and Petrochemical Plants Complex;
Development of technical assignment, technical design, APCS software, performing installation and commissioning works at Heavy Coker Gasoil Hydrotreating Unit ;
Non-standard equipment technical design development and transfer to ownership, as well as development of CDU/VDU-6 design and detailed documentation, 3D model and its catalogue;
Having all the required actions done in state expertise authorities to follow the design and detailed documentation, results of engineering surveys, and also conclusion, alteration, execution, termination of contracts for state expertise;
Technical follow-up of orders for CDU/VDU-6 equipment manufacturing;
CDU/VDU-6 construction follow-on;
Developing and transferring to ownership the East-West pipe rack design and detailed documentation, 3D model and its catalogue, interfacing with Aromatics Complex pipe racks;
Following all the required expert reviews and approvals in state expertise authorities to obtain the approval of design documentation in FAU RF Glavgosexpertiza;
Having all the required actions done in state expertise authorities to follow the design documentation, results of engineering surveys, and also conclusion, alteration, execution, termination of contracts for state expertise;
-West pipe rack construction field supervision;
Development of design and detailed documentation, 3D model and Catalogue for FCC Unit (Section 4300) of Refinery and Petrochemical Plants Complex, Nizhnekamsk;
Detailed documentation for technical support of manufacturing orders for sewage pumping stations, intershop pipe racks, cable racks for Reforming Unit cables to FCC control room;
Reactor/Regenerator Unit technical design development;
Construction follow-on;
Development of Feasibility Study for ETBE production organization for further use during production of finished motor gasoline, as well as transfer of part of produced ether to manufacture high-concentrated isobutylene in order to ensure feed demand of JSC EZSK;
Preparation of Analytical Report on inclusion of bioethanol in motor gasoline pool and application as feedstock for ETBE production;
Bioethanol production;
Technical audit services of Yelkhov Refinery Directorate, being a part of PJSC Tatneft NGDU Yelkhovneft.
Participation, outcome analysis and technical support in conducting fixed run to process compounded oil at CDU/VDU, Yelkhov Refining Plant;
Development of technical and economic estimate of possibility to produce aviation gasoline at Yelkhov Refining Plant;
Rendering engineering services during commissioning of Desulphurization unit at Minnebaevsky CGP. Unit 400N
Development of design and detailed documentation, 3D-model and its catalogue for CDU/VDU-6 at Refinery and Petrochemical Plants Complex, Nizhnekamsk;
CDU/VDU-6, build. 1007 Section 1102 Construction follow-on;
Development of Stadiya Proekt documentation (Design Documentation) for Refinery and Petrochemical Plants Complex with increased hydrocarbon crude output;
Rendering engineering services during commissioning Gas Treatment Unit at Irgizskoye field;
Rendering engineering services on reconstruction of industrial facilities at OOO Tatneft-Nizhnekamskneftekhim-Oil;
Services on technical and process audit related to glass fiber manufacturing process safe operation at PD Tatneft Alabuga Steklovolokno
Support service for implementation of summarized recommendations on upgrade of existing system of safe process operation at Yelkhov Refinery Directorate being the part of NGDU Yelkhovneft, PJSC Tatneft;
Development of preliminary feasibility study for high-octane additive production project on the basis of ethanol and toluol at the TANECO Complex;
Development of technical and economic estimate of possibility to use hydrocarbon gases from TANECO Delayed Coking Unit;
Development of technical and economic estimate for Sulfuric Acid Alkylation Unit integration to TANECO Complex.